|
|
 |
Consultation
Every Church is unique in some way,
so first... we listen |
 |
Survey & Report
After the initial consultation we will present you with
a
report that details our recommendation for installation |
 |
Demonstration
Having installed over 2,000 systems we can almost
guarantee to put you in touch with someone in your area |
 |
Installation
Before we begin any work, we will fully discuss the installation
detail and pay special attention to aesthetic considerations |
 |
System Optimization
Our engineers optimize the system
so
that it is right for your needs |
 |
Hands-on Training
To maximize the benefit of your investment,
training is essential |
 |
After-Sales Service
We are committed to the Church and believe our
aftersales service to be second to none |
 |
|
|
 |
|
|
 |
The Church & The Business
of Communication  |
 |
The Importance of Training
 |
 |
Salvation Army Norwich
Norwich | Norfolk

Large Salvation Army citadel.
Consultant: Jon Miles
Church Capacity: 400
Installation: PA & Audio Visual System
The Requirement:
To design and install a modern integrated PA and AV system with the flexibility required for this multi-use building. Particular initiative is needed in the design due to the size and layout of the worship hall with its ground and balcony levels
Customer Response:
“Thank you Jon, DM Music have been prompt and professional in all that you have done for us. We as a Church are grateful for bringing us into the 21st Century. God bless you and your team.”
Capt. Ray Begley |
|
| TELEPHONE: 01582 768844 FOR HELP AND ADVICE - © DM INSTALLATION PROJECTS 2007 - A DIVISION OF DM MUSIC FOR CHURCHES |
|